classic case
Project Status:
Thermal power plant of a Zhejiang Paper Group Co., Ltd.
A set of cooling circulating water system with a circulating capacity of 16000m3/h will be built as a supporting facility. The supplementary water quality of the system is river water near the power plant.
The main problems of the project: bacteria and algae reproduction, slime, poor water quality
| Serial number | project | System parameters |
| 1 | Circulating water volume (m3/h) | 12000 |
| 2 | Water retention m3 | 6000 |
| 3 | System equipment material | Carbon steel, copper, stainless steel |
| 4 | Types of water treatment chemicals | Corrosion and scale inhibitor, bactericidal algicide, slime stripper |
Project operation control results: The system has been operating stably throughout the year, bacteria, algae and slime are basically controlled, and the terminal difference is stable at about 9°C

Before taking over After taking over

Before taking over After taking over